Eastern Green Link 3 (EGL 3) and Eastern Green Link 4 (EGL 4) Stage 2 consultation feedback form

Page 1 of 18

Survey Closes 23 Jun 2025

National Grid Electricity Transmission (NGET) is consulting on proposals for Eastern Green Link 3 (EGL 3) and Eastern Green Link 4 (EGL 4), two offshore high voltage electricity links between Scotland and England, with converter stations and associated onshore infrastructure. NGET’s proposals are for EGL 3 and EGL 4 in England and English waters.

This is our second public consultation on our proposals for EGL 3 and EGL 4. It is called a statutory consultation because it is being carried out in line with the formal requirements of the Planning Act 2008.

It follows our previous stage 1 (non-statutory) public consultation on our draft proposals which were held in Spring and Summer 2024.

This stage 2 consultation will open at 12pm noon Tuesday 13 May and close at 11:59pm Monday 23 June 2025.

EGL 3 and EGL 4 are projects of national significance. These types of projects require a special type of consent, known as a development consent order (DCO).

Consultation is an important part of the DCO process, as it enables everyone to comment on our proposals. Feedback from our consultations – along with the outcome of technical assessments and environmental surveys – helps us to develop our proposals before we submit our DCO application to the Planning Inspectorate.